Updated May-2025 Exam Engine for C_IBP_2311 Exam Free Demo & 365 Day Updates
Exam Passing Guarantee C_IBP_2311 Exam with Accurate Quastions!
SAP C_IBP_2311 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
NEW QUESTION # 25
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question
- A. Identify inventory items that quire closer attentions
- B. Substitute missing values in case of sporadic demands.
- C. Choose time-independent key figures as segmentation measures
- D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"
Answer: A,C
NEW QUESTION # 26
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.
- A. Only attribute-based totals can be added to the planning view.
- B. The values of the attribute-based total at the highest attribute level in the planning level can be - changed
- C. The total value can be added before or after the selected attribute
- D. The Total number of the attribute that can use subtotal in the planning view can be restricted
Answer: C,D
NEW QUESTION # 27
What is taken as an input for the demand sensing process? Note: There are 2 correct answers to this question.
- A. Open Sales Order
- B. Results of time series analysis
- C. Forecast Accuracy measures
- D. Consensus Demand
Answer: A,D
NEW QUESTION # 28
Model configuration allows the attributes of a master data type to be assigned as key figures Which feature is relevant for this type of object?
- A. This type of key figure has better performance than a time-independent key figure
- B. This object contains user-defined criteria that monitor the running of business plan
- C. This type of key figure is not usually stored and it cannot be s itable
- D. This object usually provides a single value for a unique planning combination
Answer: D
NEW QUESTION # 29
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct answers to this question
- A. The calculation chain for a key figure must always result in a calculated key figure
- B. All key figure calculation have calcuation inputs, which can be marked as stored or calucated
- C. Key figure can be calculated across the different planning levels
- D. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation u level.
Answer: B,C
NEW QUESTION # 30
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct answers to this question.
- A. Rename the charts
- B. Link two analytics charts.
- C. Display all assigned analytics on a single UI
- D. Use drill-down functionality
- E. Add Process instances
Answer: C,D,E
NEW QUESTION # 31
You are working with inventory key figures. What are some of the business scenarios where you can use the Last Period Aggregation function? Note: There are 2 correct answers to this question
- A. Searching for and returning the last not-full value of the inventory key figure
- B. Calculating how many periods inventory is going to last based on the planned demand
- C. Calculating the value of inventory on any level from the time profile, ensuring flexibility of calculation
- D. Calculating the value of inventory on on weekly basis, using static argentation from the daily 'evel
Answer: C,D
NEW QUESTION # 32
You need to create time periods for the time profile in a planning are
a. What should you be aware of when running the Create Time Periods application job?
- A. This application job can also be triggered from SAP IBP, add-in for Microsoft Excel
- B. The planning area to which the time profile is assigned must be active
- C. A time profile has to be activated so that application job can proceed
- D. It is mandatory to specify the planning area in the Parameter Section of the application job
Answer: C
NEW QUESTION # 33
You want to display and edit data in different Units of Measure (UOM). Which of the following must you consider before you use the UOM? Note: There are 3 correct answers to this question.
- A. Units of measure are usually not time-independent.
- B. Units of measure is an attributes of master data type, such as product
- C. Analytics allow the user to select the target unit of measure
- D. Conversion to the target unit of measure is handled by the SAP IBP Excel add-in.
- E. Units of measure are usually not time-dependent
Answer: B,C,E
NEW QUESTION # 34
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question
- A. Aggregated constraints
- B. Maximum lot size
- C. Transportation lead time
- D. Adjusted transportation receipts
- E. Minimum lot size
Answer: C,D,E
NEW QUESTION # 35
Which processes are running in sampl to this question.
- A. Demand Sensing
- B. Response Planning
- C. Supply and Allocation Planning
- D. Inventory Optimization
- E. Sales and Operation planning
Answer: A,D,E
NEW QUESTION # 36
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.
- A. Minimum capacity utilization will result in pull production
- B. Excess stock can be generated and will need to be staged in an overflow warehouse
- C. Capacity leveling will be possible for production and storage resources.
- D. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs
Answer: B,D
NEW QUESTION # 37
Which of the following solutions should be satisfied with violations penalized by the objective function ofthe time-series supply optimizer? Note: There are 3 correct answers to this question. Not adhering to maximum transport values
- A. Not-fully satisfied demands
- B. Not respecting production capacity
- C. Violation of minimum aggregated inventory vales
- D. Violation of minimum resource utilization
Answer: A,C,D
NEW QUESTION # 38
Which Maintenance, Repair, and Overhaul (MRO) parts planning processes are included in SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question.
- A. Demand Driven Replenishment
- B. SAP Intelligent Asset Management
- C. Demand Planning
- D. Supply Planning
- E. Inventory Optimization
Answer: C,D,E
NEW QUESTION # 39
As an architect, you are configuring the Planner Workspaces user interface settings. Which appearance settings are on your to-do list? Note: There are 3 correct answers to this question
- A. Add playbooks for alerts
- B. Adding planning view
- C. Define key figure formatting
- D. Add Navigation profile
- E. Add custom alerts
Answer: A,B,E
NEW QUESTION # 40
You are implementing SAP IBP for sales and operations and are researching forecast mode algorithms. What are some of the algorithms that can be used? Note: There are 2 correct answers to this question
- A. Sporadic demand models algorithms
- B. Data-cleansing algorithms
- C. Naive models algorithms
- D. Trend models algorithms
Answer: C,D
NEW QUESTION # 41
You are evaluating criteria for choosing the solver to support planning for a complex supply What are some of the points that should be reviewed? Note: There are 2 correct answers to this question.
- A. Push and Pull production models are used by the optimizer
- B. Prioritization of demand elements one by one is achieved by unconstrained heuristics
- C. Finite heuristics works with demand prioritization
- D. Planning results can be generated faster by the optimizer.
Answer: A,C
NEW QUESTION # 42
How many different time levels can be selected within one planning view?
- A. Only time levels from the base planning level of selected key figures
- B. All time levels available in the time profile
- C. The number of time levels is restricted to four to avoid negative effects on performance
- D. All time levels available in the time profile, restricted by global configuration parameter
Answer: D
NEW QUESTION # 43
Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note:
There are 2 correct answers to this question.
- A. Balancing Supply and Demand
- B. Stock Replenishment
- C. Order Prioritization
- D. Inventory Build and Reduction
Answer: A,D
NEW QUESTION # 44
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3correct answers to this question
- A. Scenario ID
- B. Key figure type
- C. Reason code
- D. Attributes
- E. Modified code
Answer: C,D,E
NEW QUESTION # 45
What is an example of a commonly used time-independent key figure?
- A. A Special key figure marked as an aggregate key figure (aggregate constraint)
- B. A currency conversion key figure, such as Exchange Rate
- C. Any attribute as a key figure
- D. A unit of measure key figure, such as UoM Conversion Factor
Answer: C,D
NEW QUESTION # 46
......
Exam Questions for C_IBP_2311 Updated Versions With Test Engine: https://www.validtorrent.com/C_IBP_2311-valid-exam-torrent.html
Test Engine to Practice Test for C_IBP_2311 Valid and Updated Dumps: https://drive.google.com/open?id=1bLALdr93sp0Tn2Nn6bnvENT-lTBPDg_c